BROMLEY HIGHWAY CULVERTS PROJECT

Pipeline Associates laid in excess of 600 metres of water culverts, ranging in size from 3000mm—1200mm to 1800mm—1500mm. The larger culverts weighed around 11 tonnes each and were laid at depths of down to 5 metres. Craneage and lifting plans were managed by our highly trained key members of staff.

This was certainly a challenging project due to the size of culverts to be laid in residential streets. Negotiating numerous existing services and poor ground conditions, we successfully delivered a high quality product safely and efficiently.