BECKTON SEWERAGE TREATMENT WORKS PROJECT

Pipeline Associates were awarded this fast track process project to install pipework in a wide range of sizes, allowing for the safe transportation of chemicals from storage vessels to dosing points.

The work involved supply and installation of over 4500 metres of dual containment chemical dosing pipe. Installation requirements were for both buried and above ground pipework.

All lines were then tested and commissioned to the complete satisfaction of our client and Thames Water.