DARTFORD TRANSFER WATER MAINS PROJECT

Pipeline Associates were commissioned to lay, test and commission 3 way transfer mains in Dartford, Kent.

The works consisted of 800mm raw line and 800mm potable line in ductile iron laid at depths ranging from 1.9 metres to 4.5 metres. These pipelines are serviced by 355mm polyethylene fusion welded pipes and 315mm PVC pipes to various boreholes.

The project covered a distance in excess of 7 kilometres across ground conditions which included highways and residential areas.